Power Bank Pre-Shipment Inspection Checklist
Verify the exact finished-goods lot before it leaves the factory. Confirm the PO, SKU, revision, quantity, product, pack-out, labels and release evidence against the approved state.

Pre-Shipment Inspection — 4 Practical Checks
Record the exact shipment baseline, check result, evidence and disposition. Do not release on an overall score if safety, identity, quantity or pack-out remains unresolved.



Best for: confirming the exact order and finished-goods lot.
PO / buyer reference: ___
SKU / production lot: ___
Spec / BOM / firmware: ___
Golden sample / artwork revision: ___
Order quantity / carton count / ratio: ___
Decision: Match / Recheck / Hold
Best for: verifying the shipped product is physically and functionally correct.
Color / surface / logo / assembly: ___
Scratch / dent / stain result: ___
Input / output / USB-C: ___
PD / PPS / built-in cable / mechanism: ___
Display / wireless / other function: ___
Decision: Pass / Sort / Hold
Best for: checking shipment presentation and release files.
Retail artwork / label / Wh: ___
Barcode / SKU scan: ___
Manual / language / accessories: ___
Master carton / shipping marks: ___
Packing list / compliance / transport files: ___
Decision: Pass / Correct / Hold
Best for: deciding whether the lot can leave the factory.
Critical / major / minor findings: ___
Sort / rework required: ___
Re-inspection result: ___
Open deviations: ___
Release approver / date: ___
Release: Pass / Conditional / Hold
Rule: PSI release applies only to the exact PO, SKU, lot and approved revision inspected. Define sampling and defect classes for the project; critical release conditions may require stricter or zero-tolerance logic. Any sorted, repaired or repacked lot must be re-inspected before shipment.
Pre-Shipment Release Decision & Next Gate
PO, SKU, lot, revision and required shipment checks are verified.
Safety, compliance, identity or major-function issues remain.
Quantity, barcode, manual, pack-out or carton details need correction and verification.
Sorted, repaired or repacked goods must close the affected requirements before release.